Citytunnel Malmo - Slab Track

Citytunnel Malmo - Slab Track

Slab track construction, two single track tunnels with a length of 6.6km each.

Citytunnel Malmö_Feste Fahrbahn_1

Citytunnel Malmo - Slab Track

Client:

Banverket Produktion

Location:

Malmo, Sweden

Project time:

09/2009 - 04/2010

Executing companies:

Rhomberg Bahntechnik

Contract value:

11 Mil. €

 

The project consists of two single track tunnels with a length of 6.6km each. The slab track is constructed using a HALVT system.

The line contains two stations (Hyllie and Triangeln) and the main station Malmö C Nedre. In the northern part of the section six switches & crossings (S&C's) were installed. These form an integral part of the slab track section.

  • 13.2km slab track (system HALVT)
  • 10‘000m³ concrete for slab track
  • 6 S&C‘s integrated into the slab track
  • 6 transitions between ballast and slab track