app.user_location_info.da_to_general
Flag global global
Flag Østrig Østrig
Flag Tyskland Tyskland
Flag Schweiz Schweiz
Flag Storbritannien Storbritannien
Flag Irland Irland
Flag Australien Australien
Flag Nordamerika Nordamerika
Flag Rhomberg Sersa Rail Group Norden
Flag Emeran Braun Emeran Braun
Hjemmeside
tjenester
Planning and modelling of railway technology projects (BIM)

Planning and modelling of railway technology projects (BIM)

Digital planning, construction and foundations for operations.

Planung und Modellierung BIM_2

Product description

In traditional infrastructure projects, work is often carried out sequentially, without a shared as-is model as a common basis. As a result, clashes and inconsistencies are often identified late, resulting in interdependent inconsistencies. This leads to delays, unnecessary risks, and costly adjustments.

With BIM-supported planning and modelling, we create a shared, visual data foundation for all project stakeholders.

Our 3D model simplifies decision-making and strengthens the involvement of the entire project team. It enables virtual walkthroughs, supports joint coordination during the design phase, serves as a basis for work preparation, allows for 4D/5D simulations, and accompanies the project through to as-built documentation and integration into asset management.

Our services

  • Modelling (creation of the model) in accordance with the project-specific requirements of the client
  • Condition assessments and virtual project walkthroughs
  • Planning and project modelling across all project phases
  • 4D and 5D modelling for schedule and cost integration
  • Creation of as-built models
  • Model-based documentation of structures and projects

Your advantages

  • High-quality and reliable foundations for efficient and forward-looking planning 
  • Efficient processes throughout the value chain thanks to targeted modelling information 
  • Cost and time savings through virtualised information for planning and construction preparation 
  • Highly reliable planning and reduced project risks  
  • Precise building documentation and transfer to operation 
Contact
0
Referencemappe
Del referencemappe
*